AllExperts > Encyclopedia 
Search      
Find out about volunteering to AllExperts

Skjold class patrol boat: Encyclopedia BETA


Free Encyclopedia
 Index · Browse A-Z  · Questions and Answers ·
Encyclopedia

Browse A-Z
ABCDEFGHIJKLMNOPQRSTUVWXYZNum


License
Disclaimer

 
 
 
 
Free Online Courses
12 Weeks to Weight Loss
Take Charge of Stress
Learn How to Bake
Budgeting 101
Deeper Faith
DIY Fashion Makeover

       MORE E-COURSES
 
   

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z  Misc

Skjold class patrol boat

HNoMS Skjold in Ft. Washington, Maryland

Career

Norwegian Navy flag

Ordered:July 1996
Laid down:August 4, 1997
Launched:September 22, 1998
Commissioned:April 17, 1999
General Characteristics
Length:
Beam:
Draft:
Displacement:274 tonnes full load
Propulsion:Loiter diesel engine
â†'
Twin boost turbines
â†'
Twin diesel engines
â†'
Complement:16 men
Armament:8 Naval Strike Missile SSMs (when available) kept in an internal weapons bay
76mm Oto Breda Super Rapid multi-role cannon
Mistral missile SAM
12.7mm gun
Speed:In rough sea:

In calm sea:
Sensors:Thales MRR-3D-NG air/surface radar
Ceros 200 FC
CS-3701 electronic warfare suite
Sagem Vigy 20 Electro-optical sensor
Soft kill:MASS decoy (32)
Other:Link 11 and Link 16
The Skjold class patrol boats (skjold means "shield" in Norwegian) is a new class of superfast, stealth missile boats, also known as MTBs (missile torpedo boats). This design is completely Norwegian, and they are at this time the fastest warships in the world. Due to the speed and stealth capabilities, The U.S. Navy has expressed interest and have evaluated the design;the first KNM Skjold was leased for one year by the USN. The Skjold-Class MTBs will be added to the pool of "old" Hauk class MTBs. Six Skjold class MTBs are to be commissioned, but at this time only the lead ship Skjold has been built, to test the design. The rest are at various levels of completion, with the next, Storm, to be delivered in April 2008. Following that, one new ship will be delivered every three months until Gnist is delivered in June 2009.

The first of the class, the Skjold was commissioned in 1999, and operated by the Norwegian Navy. The U.S. Navy had expressed interest in the design and leased the vessel for a period of year. During this time it was operated by a 14 man Norwegian crew out of Naval Amphibious Base Little Creek. Raytheon had an international partnership to offer an improved Skjold vessel in the American Littoral Combat Ship (LCS) competition. Though, as quoted in the Jan-March 03 issue of Fathom LCdr. Andersen says "Weare here in uniform as Norwegian navy representatives: We're part of a navy-to-navy relationship... ". Later on in the article he is quoted saying, "It is my hope that our presence here has been helpful to the process the U.S. Navy has started toward transformation and that we have offered some new ideas for ship design..". The Raytheon consortium was one of three to make it to the final round of contenders. It would not be selected, the Navy opting for larger all-new designs (a monohull, and trimaran with heli-pads). However, it did make it farther then another Scandic contender, a LCS contender based off the Swedish Visby class corvette class, which was offered by a Northrop Grumman (with Kockums AB) lead group.

To ensure stealth capabilities radar absorbent materials(RAM) have been used in the load bearing structures over large areas of the ship. This strategy leads to significant weight saving compared to conventional construction techniques of applying RAM cladding to the external surfaces. The ship's profile has a faceted appearance with no right angle structures and few orientations of reflective panels. Doors and hatches are flush with the surfaces and the windows are flush without visible coaming (edge of window aperture) and are fitted with radar reflective screens.

The final design will see some changes compared to the prototype Skjold, which itself is being rebuilt to the new specifications. Most notably, the new vessels will use 4 gas turbines, two big ones and two small ones (no diesel engines), giving even more power. Furthermore, the foredeck will be strengthened due to the 76mm Super Rapid gun chosen, the production of the hull material is being done using a different method to improve strength and minimize the fire vulnerability, and the bridge will also see some changes.

Vessels

Skjold class — significant dates
#NameLaid downLaunchedCommissionedNotes
P960SkjoldAugust 4, 1997September 22, 1998April 17, 1999Being refitted with new turbines
P961Storm70% complete as of 2006
P962SkuddApproaching 50% complete as of 2006
P963Steil
P964Glimt
P965Gnist

See also

* List of ships of the Norwegian Navy

External links

*Unofficial webpage by the KNM Skjold crew (english)
*Official Skjold-class webpage from the Norwegian Armed Forces
*2003 Navy document on lease of Skjold PDF version)



Email this page
About Us | Advertise on This Site | User Agreement | Privacy Policy | Kids' Privacy Policy | Help
About and About.com are registered trademarks of About, Inc. The About logo is a trademark of About, Inc. All rights reserved.
This is the "GNU Free Documentation License" reference article from the English Wikipedia. All text is available under the terms of the GNU Free Documentation License. See also our Disclaimer.